91巨炮在线丨高h七仙女辣黄h丨午夜a理论片在线播放丨日本欧美一区二区三区高清丨国四虎影2020丨国产欧美国日产在线播放丨欧美巨波霸乳影院丨污污污污污污www网站免费丨少妇淫交裸体视频丨91丨九色丨喷水丨精品国产免费人成电影在线看丨色喜国模李晴超大尺度丨色天堂视频丨欧美色视频在线播放丨岛国4k人妻一区二区三区丨老女人黄色片丨久草最新视频丨欧美成人猛片aaaaaaa丨深夜国产视频丨97精品亚成在人线免视频

Welcome to Ningbo Chaori Hydraulic.Co.Ltd.!
CN EN ES
Hotline

(86)13208083169

0574-88850227

Accumulator installation precautions

皮囊式蓄能器2.jpg

 

The accumulator should be installed at a convenient location for inspection and maintenance. When used to absorb shock and pulsation, the accumulator should be close to the vibration source, and should be installed in the place where the impact is easy. The installation position should be away from the heat source to prevent the system pressure from rising due to the thermal expansion of the gas.


The accumulator must be securely fastened but not allowed to be welded to the main unit and should be securely supported on the bracket or on the wall. When the diameter ratio is too large, hoop reinforcement should also be provided.


In principle, the capsule accumulator should be installed vertically downwards. When tilting or horizontally mounted, the bladder is in contact with the shell by buoyancy, which hinders normal telescopic operation, accelerates the damage of the bladder, and reduces the risk of accumulator function. . Therefore, the method of tilting or horizontal mounting is generally not used. There are no special installation requirements for diaphragm accumulators, and the oil ports can be installed vertically, tilted or horizontally downwards.


A check valve should be installed between the pump and the accumulator to prevent the oil in the accumulator from flowing back into the pump and returning to the tank when the pump stops working, causing an accident.